A small bus from the rural transit assistance program drives down a country road surrounded by fields, wooden fences, and distant barns, with tall, snow-capped mountains and a blue sky in the background.

Rural Transit Assistance Program (RTAP) Study

Montana Department of Transportation (MDT)

Needs Study

2024

Montana (Statewide)

Three blue circles, symbolizing consulting transportation, are arranged in a triangular formation and connected by faint curved lines forming a circular pattern on a light gray background.

Complete a training needs assessment and annual work plan for the Rural Transit Assistance Program for the State of Montana.

A simple illustration of a chain link with two interlocking segments, symbolizing dot consultant collaboration; the left segment is white and the right is light blue, set against a light gray background.

Create a roadmap for an effective MDT RTAP by thoroughly assessing the training and technical assistance needs of the Montana transit systems, analyzing the effectiveness of current training efforts, and crafting a path forward through a detailed work plan.

Three blue circles, symbolizing consulting transportation, are arranged in a triangular formation and connected by faint curved lines forming a circular pattern on a light gray background.

Big Sky Public Relations

Overview

Montana Rural Transit Assistance Program (RTAP) Study

DRB conducted a statewide Rural Transit Assistance Program (RTAP) needs study for the Montana Department of Transportation to support the development of a more effective, responsive RTAP program. The project focused on understanding the training and technical assistance needs of Montana’s rural transit systems and translating those insights into a clear, actionable annual work plan.

Project Rundown

  • Project Name: Montana Rural Transit Assistance Program (RTAP) Study
  • Client: Montana Department of Transportation (MDT)
  • Project Budget: $89,880.34
  • Location: Helena, MT (Statewide)
  • Start Date: June 3, 2024
  • End Date: December 31, 2024
  • Service Type: Needs Study

Scope of Work 

The project centered on developing a training needs assessment and annual work plan to guide future program delivery. DRB’s scope included:

  • Assessing training and technical assistance needs across Montana’s rural and Tribal transit systems
  • Evaluating the effectiveness of existing RTAP training efforts
  • Developing a detailed, data-informed work plan to guide future program delivery
  • Delivering a final plan document and presenting the findings

Similar Projects

Two people sit at a table; one is using a laptop displaying a form, while the other, likely one of the transportation consultants, holds a notepad and pen, gesturing as they discuss important details together.

MnDOT Pathways to Success

DRB provides program management and direct business development support for the MnDOT Office of Civil Rights’ Pathways to Success initiative – designed to strengthen certified small businesses and prepare them for long-term success in public-sector contracting.

LEt’s Get Started

Start Your Project Today

Whether you’re scoping a new project or need experienced support midstream, DRB is ready to step in. We’ll align quickly, clarify expectations, and help you move forward with confidence. Let’s talk about your project!